Podcast Episodes

Back to Search
PJM and CAISO Rewrite the Rules for AI Load
PJM and CAISO Rewrite the Rules for AI Load

Episode 77

PJM and CAISO are moving on large-load rules as data centers test interconnection, resource adequacy, and emergency curtailment, while Evergy’s 3 GW …

1 month, 3 weeks ago

Short Long
View Episode
Japan-Backed Gas Power Meets AI Grid Strain
Japan-Backed Gas Power Meets AI Grid Strain

Episode 76

NextEra Energy locked in U.S. and Japan funding terms for up to 10 GW of gas generation in Texas and Pennsylvania, while data center cooling rules an…

1 month, 3 weeks ago

Short Long
View Episode
Data Center Capital Hits Grid Rules and Local Permits
Data Center Capital Hits Grid Rules and Local Permits

Episode 75

Digital Core REIT, Digital Realty and MISO show AI infrastructure’s capital stack shifting from asset sales and tax breaks to interconnection credit …

1 month, 3 weeks ago

Short Long
View Episode
Power, Guarantees and Debt Behind the AI Buildout
Power, Guarantees and Debt Behind the AI Buildout

Episode 74

CyrusOne, Meta and Alphabet put hyperscale infrastructure financing in focus, from a potential 2027 IPO to a BlackRock-backed El Paso campus and $25 …

1 month, 3 weeks ago

Short Long
View Episode
AI buildout runs into city halls, grid queues and fiber maps
AI buildout runs into city halls, grid queues and fiber maps

Episode 73

Nvidia, PJM and rural Nevada show the AI infrastructure buildout moving on three fronts: Zayo’s long-haul fiber deal, a 201.5 GW reformed PJM queue, …

1 month, 3 weeks ago

Short Long
View Episode
FERC Win Meets Water Rules in AI Data Center Buildout
FERC Win Meets Water Rules in AI Data Center Buildout

Episode 72

FERC’s interconnection plan survived DC Circuit review, while state lawmakers are tightening data center water oversight and capital keeps piling int…

2 months ago

Short Long
View Episode
NTT Data Eyes $9.6B Japan Buildout as Data Center Capital Tightens
NTT Data Eyes $9.6B Japan Buildout as Data Center Capital Tightens

Episode 71

NTT Data plans to spend at least $9 billion to reach 1 GW of Japan data-center capacity by 2033, while institutional lenders and local governments sh…

2 months ago

Short Long
View Episode
ERCOT Pauses Batch Zero as Texas Orders Data Center Audits
ERCOT Pauses Batch Zero as Texas Orders Data Center Audits

Episode 70

ERCOT faces a Batch Zero delay after Governor Greg Abbott ordered audits of data centers before grid interconnection, raising fresh uncertainty for l…

2 months ago

Short Long
View Episode
Equinix Issues $3B as Data-Center Power Fights Spread
Equinix Issues $3B as Data-Center Power Fights Spread

Episode 69

Equinix has issued $3 billion in bonds for its AI-ready infrastructure buildout as Cape Town advances planning for two proposed sites and AEP makes t…

2 months ago

Short Long
View Episode
Data Center REITs Tap Debt as AI Load Forecasts Climb
Data Center REITs Tap Debt as AI Load Forecasts Climb

Episode 68

Equinix is seeking $3 billion in investment-grade debt as Digital Realty’s bookings tilt toward higher-priced smaller leases and NextEra lifts FPL’s …

2 months ago

Short Long
View Episode

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us