Podcast Episodes

Back to Search
Ming Yang Eyes 33 MW Turbine, Greenvolt Delays FID

Ming Yang plans a 33 MW turbine while China pulls European tech out of its wind farms. Plus white-hat hackers reach 7.8 GW in Germany, Vårgrønn eyes …

3 weeks, 3 days ago

Short Long
View Episode
Trump Delays Turbine Tariffs, Pentagon Approves Two Projects
Trump Delays Turbine Tariffs, Pentagon Approves Two Projects

Trump skips turbine tariffs, the Pentagon clears two wind farms, the DOJ targets Revolution Wind, and China pushes into Europe. The Uptime Wind Energ…

3 weeks, 4 days ago

Short Long
View Episode
Tightline and Avient Remove Peel Ply From Carbon Planks
Tightline and Avient Remove Peel Ply From Carbon Planks

This week we're revisiting our discussion with Andrew Davis of Tightline Composites and Brad Schmidt of Avient, who discuss a resin additive that eli…

4 weeks, 1 day ago

Short Long
View Episode
Nordex Q3 Orders Jump 30%, Vestas Bets on Australia

Nordex Q3 orders jump 30% and Vestas lands about a gigawatt in Australia. Plus why turbine factories skip Australia, high project costs, and whether …

1 month ago

Short Long
View Episode
Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles
Trump Targets Revolution Wind, Nordex Q3 EBITDA Doubles

Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter p…

1 month ago

Short Long
View Episode
How CICNDT Qualifies Inspectors for Complex Blade Scans
How CICNDT Qualifies Inspectors for Complex Blade Scans

Jeremy Heinks, founder and CEO of CICNDT, joins to discuss the inspector shortage, Level III oversight, blade samples, drone thermal limits, and IEC …

1 month ago

Short Long
View Episode
China Barred Vestas Software, Ørsted Buys Chinese Monopiles

Vestas CEO Henrik Andersen says China barred Vestas from monitoring its own turbines. Plus Ørsted takes heat for Chinese monopiles, India’s blade des…

1 month, 1 week ago

Short Long
View Episode
Ørsted Finishes Drone Trial, Iberdrola Exits South Korea
Ørsted Finishes Drone Trial, Iberdrola Exits South Korea

Allen covers Ørsted’s Hornsea 2 drone trial, the DeepWind test site, Germany’s proposed land rent cap, and Iberdrola’s Korea exit. The Uptime Wind En…

1 month, 1 week ago

Short Long
View Episode
How DTU’s Rain Test Facility Predicts Erosion
How DTU’s Rain Test Facility Predicts Erosion

Rosemary visits DTU Wind & Energy Systems in Denmark, where Nicolai Frost-Jensen Johansen explains rain erosion testing, tip speed, and LEP defects. …

1 month, 1 week ago

Short Long
View Episode
What Rosie Learned in Europe’s Wind Turbine Test Labs

Rosie returns from Denmark and shares her experiences seeing DTU blade testing, a lightning lab, and a 15 MW Vestas test turbine. The Uptime Wind Ene…

1 month, 2 weeks ago

Short Long
View Episode

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us