Episode Details

Back to Episodes
Village of Oak Creek Roadwork Paused Until Spring

Village of Oak Creek Roadwork Paused Until Spring

Published 3 weeks, 5 days ago
Description

Send us a text and chime in!

Please be advised that chip seal operations across various roads in the Village of Oak Creek are temporarily paused due to current weather conditions. Chip seal applications require specific ambient and road surface temperatures to ensure proper adhesion, curing, and long-term durability of the roadway surface. Due to recent seasonal drops in temperature, current weather conditions no longer meet the required minimum temperature specifications for safe and effective application. Work will resume in the spring once weather conditions improve and temperatures consistently meet optimal application thresholds. A follow-up press release will be issued to notify the public of the updated...

 

For the written story, read here >> https://www.signalsaz.com/articles/village-of-oak-creek-roadwork-paused-until-spring/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us