Episode Details
Back to Episodes
Village of Oak Creek Roadwork Paused Until Spring
Description
Please be advised that chip seal operations across various roads in the Village of Oak Creek are temporarily paused due to current weather conditions. Chip seal applications require specific ambient and road surface temperatures to ensure proper adhesion, curing, and long-term durability of the roadway surface. Due to recent seasonal drops in temperature, current weather conditions no longer meet the required minimum temperature specifications for safe and effective application. Work will resume in the spring once weather conditions improve and temperatures consistently meet optimal application thresholds. A follow-up press release will be issued to notify the public of the updated...
For the written story, read here >> https://www.signalsaz.com/articles/village-of-oak-creek-roadwork-paused-until-spring/
Check out the CAST11.com Website at: https://CAST11.com
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network