Episode Details
Back to Episodes
Designing Below Ground: Steel-Free Caissons and Tunnels 250 Feet Down
Published 1 month ago
Description
https://stiverengineering.com/civil-engineering-services/
What happens when rebar isn’t an option for a deep foundation? A testing facility needed steel-free caissons, and Stiver Engineering designed them. This episode also covers tunnels 250 feet beneath Indianapolis, and why the tunnel eye is the riskiest moment on a shaft job.
Stiver Engineering, Inc. City: Houston Address: 1305 Peden St. Website: https://stiverengineering.com Phone: +1 713 526 3478