Episode Details

Back to Episodes
10-Tonne Turbine Shaft Installation | Mega Maintenance | FD Engineering

10-Tonne Turbine Shaft Installation | Mega Maintenance | FD Engineering

Published 1 week ago
Description

10-Tonne Turbine Shaft Installation | Mega Maintenance | FD Engineering

Watch the next episode here: https://youtu.be/CSNk4_u574E

In Australia’s second‑largest hydro station (Murray 1), experienced mechanics install a ten‑tonne intermediate shaft between turbine and generator to fix a broken unit. Concurrently, an aviation service team prepares a replacement aircraft engine, and elsewhere in Brisbane technicians assemble a large crane at height, requiring precise rigging.

#FreeDocumentary #Documentary #engineering
▬▬▬▬▬▬▬▬▬
Subscribe Free Documentary - Engineering Channel: https://bit.ly/FDEngineering
▬▬▬▬▬▬▬▬▬
“Engineering: the branch of science and technology concerned with the design, building and use of engines, machines and structures.” So says the Webster definition. Our newest Free Documentary family member Free Documentary - Engineering is all about engineering - and bringing our community the best documentaries on engineering.

Learn more about your ad choices. Visit megaphone.fm/adchoices

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us