Episode Details

Back to Episodes
Copper Basin Road Project Could Impact Your Drive

Copper Basin Road Project Could Impact Your Drive

Published 1 month, 3 weeks ago
Description

Send us a text and chime in!

Please be advised that Earth Resources Corporation, in conjunction with Yavapai County, will be performing dirt to black roadwork on Copper Basin Road from the existing pavement to the Forest Service boundary. Construction will begin September 28, 2026, continuing through December 16, 2026. Road construction will consist of roadway excavation and fill, asphalt paving, guardrail installation and drainage improvements. One lane of traffic will remain open at all times; however, motorists may encounter lane restrictions, lane shifts, reduced speeds, and flagging operations throughout the work zones. Motorists should expect minor delays and allow extra time to get through the construction...

 

For the written story, read here >> https://www.signalsaz.com/articles/copper-basin-road-project-could-impact-your-drive/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us