Episode Details

Back to Episodes
A Blinded Floor

A Blinded Floor

Published 1 month ago
Description

Part One ended on a man at a machine, solving the wrong problem well.

He is optimizing. He is a superb optimizer. We just never told him what for.

That is the second failure, and it is the one that does not go away when you fix the board. You can cut twenty metrics to five, name the binding constraint, and publish it in every aisle — and the operator will still be reasoning in the dark, because the number that gives all five their meaning is the one number we have decided he cannot see.

Three Reasons We Don’t Show the Numbers

We do not give the floor the base financials. Ask any plant leadership team why and you will get one of three answers.

They won’t understand it. This one does not survive ten seconds of contact with the people involved. The operator running a household on variable overtime, a mortgage, a car note, and a kid starting community college is performing continuous multi-constraint budgeting under uncertainty, without software, with real consequences for error. He understands margin. He has just never been shown ours.

I want to put a name against that.

Lansing Grand River, during the CTS launch. We had a chronic defect — the instrument panel scuffing the door opening as it went in. The easy move, the one the system rewards, is to blame the operator and log it. Ramon Hernandez, my team leader on instrument-panel install, did the opposite. He took the blame onto himself. He gathered data shift after shift. And he traced the fault back to a tool mechanism on his own team.

Now look at what Ramon was actually doing. A defect caught in-station costs a fraction of one caught at repair, which costs a fraction of one that leaves the plant, which costs a fraction of a warranty claim with a customer’s name on it. That is the cost-of-quality curve, and it drives an enormous share of plant profitability. Ramon worked his way down it, correctly, on nights, while absorbing blame that was not his.

He never used a word of that vocabulary. Money was never in Ramon’s language, and I want to be clear about why: we made sure it wasn’t. We stripped it out deliberately. Cost was management’s business and quality was the floor’s, and we ran the line that way on purpose.

With one exception. The floor did see the cost of scrap parts.

Sit with which number we chose. Not what the plant earned. Not the margin on a car. Not what a defect caught in-station was worth to us. The single piece of financial information we made sure the floor could see was the price of what they had ruined.

That is not withholding out of doubt about their intelligence. That is a curated disclosure, and what it was curated to produce was guilt.

Ramon pulled real money off that plant’s P&L. Nobody ever showed him how much.

They won’t hold it confidentially. Also thin. We hand quality escape data, customer complaint detail, and process specifications to the same people every day. The proprietary material is already in their hands. It is the summary statement we withhold — the one document that would let them see what all their effort adds up to.

If they see the numbers they’ll want more money. This one is honest. And it is worth sitting with what it admits.

It says: our wage will not survive scrutiny. It says we are relying on ignorance to hold the line on labour cost. It says the thing we are protecting is not confidentiality — it is an information asymmetry we have decided is load-bearing.

That is a defensible commercial position. It is not a defensible position for anyone who also claims to be developing people. You cannot form judgment in someone while withholding the only information judgment requires. Formation and information asymmetry are not compatible projects. You have to pick one.

Three Companies That Opened the Books

Springfield Remanufacturing: the

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us