Episode Details
Back to Episodes
Trishuli Surge 30 Years Erased!
Published 1Â week, 2Â days ago
Description
💧PerformLyte Hydration that Gets In https://vni.life/daviddubyne.performlyte💧
Before-slide numbers: 450 MW installed, washed out; 427 MW under construction, gone—nearly a gigawatt meant to electrify the mountains, and about 30 years of infrastructure reset.