Episode Details

Back to Episodes

Banyan Gold Hits 13.03 g/t Over 14.2m in a Largely Undrilled Gap

Published 1 month, 1 week ago
Description
Recorded on August 17 2026 at NRS Studios TSX Venture Exchange: BYNOTCQB Venture Market: BYAGF Banyan Gold President and CEO Tara Christie joins Steve Yang of Natural Resource Stocks to break down a high-grade Powerline North result at the AurMac Gold Project in Yukon. Banyan reported 13.03 g/t Au over 14.2m with an approximate true width of 12.8m, and Tara explains why the location of the intercept may be as important as the grade itself. The hole extends high-grade mineralization toward the largely undrilled gap between the Powerline and Airstrip deposits, an area Tara says could add ounces and grade if…
Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us