Episode Details
Back to Episodes
VDOT Upgrades I-64 Exit 291A | Virginia Beach News
Description
VDOT is transforming the I-64 and I-464 interchange in Chesapeake, starting August 14th with a nighttime traffic shift to a new right lane—soon to be part of a two-lane ramp. The existing left lane will close to make way for a new flyover connecting I-64 east to I-464 south and Route 168. Work is on track to finish by summer 2027, weather permitting.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/84f4a8797f624563