Episode Details
Back to Episodes
South Road Shifts for T2D Project | Adelaide News
Description
South Road near Richmond Oval is undergoing major changes as part of the Torrens to Darlington project — northbound traffic has shifted west, closer to the oval, with detours to James Congdon Drive and the CBD. Up next: Everard and Barwell Avenues will be closed while a new bridge is built to make way for a 2.7km lowered motorway section. The ultimate goal? A 78km North-South Corridor from Gawler to Old Noarlunga with zero traffic lights. South Road remains open at ground level for local access, but drivers are urged to slow down, plan ahead, and follow signs as construction ramps up.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/5fbb3b38163e89d8