Episode Details
Back to Episodes
Bridge Back Open With Key Changes | Pittsburgh News
Description
Commercial Street Bridge is back open after 17 days — but don’t expect everything to be business as usual. Extra work was done during the closure, including upgrades in nearby tunnels and ramps. The Edgewood ramp and other blocked exits are now open, and eastbound lane restrictions are lifted. However, drivers heading to Wilkinsburg or Forest Hills face a two-lane setup with the right lane blocked. Work continues on Ardmore Boulevard, with painting underway — the single-lane restriction there should lift later this week. And crucially, Commercial Street remains closed for another week — so residents near Swisshelm Park, stay put and avoid using those streets as shortcuts.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/9e629c57e2ed5c71