Episode Details
Back to Episodes
Bridge Slid Into Place Ahead of Schedule | Pittsburgh News
Description
The Parkway’s bridge replacement just pulled off an engineering marvel—imploding the old bridge and sliding a 22-million-pound monster 100 feet into place in under three weeks, ahead of schedule. PennDOT’s 24/7 crew pulled off this record-breaking, injury-free feat using cutting-edge techniques, with the new bridge set to open before August 3rd. Now, crews are sealing the structure and restoring the surrounding greenery with over 5,000 new trees—proof of relentless dedication and precision.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/e88213bb241b9b13