Episode Details
Back to Episodes
Steel Missing Caused Pfizer Building Crisis | Real Estate News
Description
A terrifying structural failure at the old Pfizer building in Midtown has exposed a catastrophic engineering oversight: critical steel reinforcement meant to stabilize upper floors was never installed, causing columns to buckle and floors to sag. Engineers blame the missing steel plates — specifically on floors 19 to 21 — for the collapse risk that forced a massive evacuation. While the Department of Buildings hasn’t officially confirmed the cause, inspectors are now scrambling across all five boroughs, and a preliminary criminal inquiry has been launched. This near-disaster underscores how vital it is to follow blueprints and maintain rigorous oversight in building conversions — or risk lives.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/68dd3b95676e1cc5