Episode Details
Back to Episodes
Port Canaveral’s $175M Cruise Terminal Upgrade | Orlando News
Description
Port Canaveral is undergoing a massive $175 million upgrade to handle bigger ships and more passengers, with Terminal Five doubling in size and a new 13-story parking garage opening next to Terminal Six—all while terminals stay fully operational. Construction crews work around the clock, setting up temporary measures to keep operations seamless. The project creates over 2,000 local jobs and transforms Terminal Five into a 170,000-square-foot hub for ships carrying up to 5,600 passengers, complete with better entrances, seating, and security. The new garage adds 3,700 spots with luggage elevators and traffic-smoothing ramps, linked directly to Terminal Five via a pedestrian bridge. Set to finish by December 2026, this expansion signals Port Canaveral’s bold move to future-proof its cruising infrastructure and meet soaring demand.
Listen in comfort:
Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/83629995dbab26c0