Episode Details
Back to Episodes
Ireland’s Power Grid Gets Major Upgrade
Description
Ireland’s power grid is getting a massive $6 billion upgrade, including a long-delayed North-South interconnector finally cleared for construction—expected to be live by 2031. This 138-kilometer link, stalled for two decades due to legal and planning hurdles, will unlock clean energy from northern wind farms, prevent wasted production, and save households €100 million annually. Part of a broader plan to handle a projected doubling of energy demand by 2050, the project is key to integrating renewables, boosting investment, and powering future growth.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/79a44c6b7fbf7b19