Episode Details
Back to Episodes
Keller Natatorium Reopens in Months
Description
Keller ISD is pouring $357,000 into urgent repairs to get their shuttered natatorium back online—after a critical filtration failure forced closure in May. Built in 2003, the facility’s systems are vital, and without a fix by December, the nine-year-old Lakeside Aquatics Club risked shutting down entirely. With a projected reopening in late September or early October, swimmers are temporarily using HOA and school pools. The district had already set aside $2.1 million for replacements, aiming to authorize the purchase by June 25th without delaying reopening. Community and athletes are counting on this fix to restore a beloved local hub—and keep it running smoothly for years.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/9ab6428273a90492