Episode Details

Back to Episodes

Ep.1610 - Advanced Work Packaging Done Right

Season 16 Episode 1610 Published 3 weeks, 2 days ago
Description

In this episode, Jason dives into the pitfalls of advanced work packaging when it's improperly implemented. Using examples from data centers and large industrial projects, he explains how poorly sized construction work packages, installation work packages, and improperly leveled zones can lead to months of wasted time, bottlenecks, and misaligned trade flows.

What you'll learn in this episode:

  • How improperly sized work packages and zones create delays and bottlenecks.
  • Why advanced work packaging without trade input can hinder performance.
  • How to structure construction, procurement, and engineering work packages correctly.
  • The role of Takt principles in optimizing installation workflows.
  • How to save months of project time by properly zoning and leveling work.

Are your work packages actually helping your project or secretly slowing it down?

 

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

 

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us