Episode Details
Back to Episodes
Center Hill Dam Road Closure: Spillway Gate Replacement
Description
Attention, Center Hill Dam area residents! State Highway 141/96 will be fully closed from 8 AM to 4 PM on May 27th for a spillway gate replacement project. This is part of a larger upgrade for flood control and water management in the Cumberland River Basin. American Bridge will replace the third spillway gate, requiring both lanes to be closed for safety. Plan alternative routes to avoid disruption. The roadway will reopen to one lane after the immediate work is done.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/12a5c954d925a2c1