Episode Details
Back to EpisodesAdelaide's $15B Tunnel Project Hits Milestone
Description
Adelaides massive Non Stop South Road project reaches a significant milestone with the first tunnel boring machines cutterhead lowered into a twenty-metre deep launch box at Clovelly Park. This is part of the River Torrens to Darlington tunnel works, South Australias biggest infrastructure push ever. The fifteen billion four hundred million dollar project, funded by federal and state governments, will finish the north-south motorway link, eliminating twenty-one traffic lights on South Road. Leaders are excited about this step, with Premier Peter Malinauskas calling it a real eye-opener, Federal Minister Catherine King highlighting how it completes Adelaides corridor, and state minister Joe Szakacs saying it makes tunnelling feel real for everyone stuck in traffic. Two boring machines are assembling side by side for the four point five kilometre southern tunnels toward Glandore and Black Forest, with a third ones parts arriving for the two point two kilometre northern stretch. Theyll dig twin tunnels at the same time starting late twenty twenty-six. With this progress, Adelaide commuters are one step closer to slashing up to forty minutes off daily drives, turning gridlock into smooth sailing by twenty thirty-one or sooner.
Support the show:
Get a discount at https://solipillow.com/discount/dnn.
Advertise on DNN:
advertise@thednn.ai
This is an automated, high-level news summary based on public reporting.
Report issues to feedback@thednn.ai.
View sources & latest updates:
https://sources.thednn.ai/d4507697ef2c7358