Episode Details

Back to Episodes
Kingfisher Expands Bulk Tonnage Gold System within the HWY 37 Project

Kingfisher Expands Bulk Tonnage Gold System within the HWY 37 Project

Published 4 months, 1 week ago
Description

Dustin Perry of Kingfisher Metals discusses the latest drill results from the  Upper Hank epithermal system. The drill hole cut 110.0 m1 of 0.47 g/t Au. This hole collared approximately 500 m to the southeast of the historical non-43-101 compliant mineral resource within the Pit area. This drill hole demonstrates high potential for lateral and vertical expansion of a near surface bulk tonnage disseminated gold system. A 500 m gap in drilling to northwest at Pit deposit, 600 m gap in drilling to west, two shallow intercepts to south, and untested eastern domains points to significant growth potential.

Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us