Podcast Episode Details

Back to Podcast Episodes

IREN - Childress Facility Tour & Analysis!


Season 1 Episode 432


We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.

• community impact in Childress and local hiring
• 750 MW campus scale with 500 MW operating
• grid-connected power and 345 kV lines
• substation readiness and long-lead equipment
• air-cooled Bitcoin halls and noise control
• onsite repair shop and uptime culture
• closed-loop cooling, wells and water logistics
• Microsoft five-year GPUs vs 20-year buildings
• future-proofing for higher rack density
• safety, security and site operations at scale

Hit the like button if you're an iron shareholder, and feel free to subscribe


Anthonys Info:

Website:

https://www.powermininganalysis.com

X:

https://twitter.com/cazenove_uk

Patreon:

https://www.patreon.com/Cazenove_UK

Bryce's Info:

X:

https://twitter.com/McnallieM

Patreon:

https://www.patreon.com/McNallieMoney

Merch:

https://shop.mcnalliemoney.com/

Website:

https://www.mcnalliemoney.com

Business Inquiries:

Email - powermininganalysis@gmail.com


Published on 13 hours ago






If you like Podbriefly.com, please consider donating to support the ongoing development.

Donate