Season 1 Episode 432
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.
• community impact in Childress and local hiring
• 750 MW campus scale with 500 MW operating
• grid-connected power and 345 kV lines
• substation readiness and long-lead equipment
• air-cooled Bitcoin halls and noise control
• onsite repair shop and uptime culture
• closed-loop cooling, wells and water logistics
• Microsoft five-year GPUs vs 20-year buildings
• future-proofing for higher rack density
• safety, security and site operations at scale
Hit the like button if you're an iron shareholder, and feel free to subscribe
Anthonys Info:
Website:
https://www.powermininganalysis.com
X:
https://twitter.com/cazenove_uk
Patreon:
https://www.patreon.com/Cazenove_UK
Bryce's Info:
X:
Patreon:
https://www.patreon.com/McNallieMoney
Merch:
https://shop.mcnalliemoney.com/
Website:
Business Inquiries:
Email - powermininganalysis@gmail.com
Published on 13 hours ago
If you like Podbriefly.com, please consider donating to support the ongoing development.
Donate