Episode Details
Back to Episodes
How Energy Storage Gets Built with Bex Sherwood (Field)
Episode 1
Published 7 months, 1 week ago
Description
Want the latest news, analysis, and price indices from power markets around the globe - delivered to your inbox, every week?Sign up for the Weekly Dispatch - Modo Energy’s unmissable newsletter.How do you take a battery project from an empty field to a grid-connected asset that actually supports the system? And with queue reforms, planning pressure, and shifting revenue stacks, what does it now take to move storage from idea to operation at speed *and* at scale?Today we’re taking a look how sites are found, why connections and planning timelines make or break projects, and which policy changes (from connections reform to Clean Power 2030) matter most for accelerating flexible capacity on the system.In this episode, Ed is joined joined by Bex Sherwood, Head of Development at Field, to unpack how a storage developer navigates origination, planning, construction and optimisation and where the biggest bottlenecks (and opportunities) now sit.Key topics covered include:
- How battery storage projects are developed. From day zero through to operations.
- The impact of Clean Power 2030 and connections reform on storage growth.
- The key challenges developers face in planning and permitting.
- How Field has evolved since 2023, moving from developer to owner, operator, and optimiser.
- Why diversity in the workforce matters for the future of batteries and STEM.