Podcast Episode Details

Back to Podcast Episodes

WSDOT Begins $203M Revive I-5 Project; Lane Closures Underway


Episode 339


(The Center Square) – The Washington State Department of Transportation’s $203 million project to repair a major section of Interstate 5 is underway with northbound traffic limited to two lanes for the next four weeks. Revive I-5 is a multi-year project with significant work on the Ship Canal Bridge located in Seattle. The project began on July 18 with northbound I-5 completely shut down through downtown Seattle up until Monday at 5 a.m. 

Support this podcast: https://secure.anedot.com/franklin-news-foundation/ce052532-b1e4-41c4-945c-d7ce2f52c38a?source_code=xxxxxx 

Read more: https://www.thecentersquare.com/washington/article_2745b7a2-81ba-459c-83fa-caec2cfc2bad.html


Hosted by Simplecast, an AdsWizz company. See pcm.adswizz.com for information about our collection and use of personal data for advertising.


Published on 4 months, 3 weeks ago






If you like Podbriefly.com, please consider donating to support the ongoing development.

Donate