The shift from traditional fuels to electricity presents one of the biggest infrastructure challenges of the energy transition. For industries like haulage, shipping, and logistics, accessing and managing gigawatt-scale electrical connections isn’t just difficult, it’s often the main barrier to progress.Delivering timely, affordable, and scalable access to power is critical for accelerating electrification and enabling hard-to-abate sectors to decarbonise at pace.In this episode of Transmission, Ed is joined by Mikey Clark, CEO of Reload Energy, to explore how the company’s “power parks” aim to solve this challenge by bringing grid-scale electricity access to where it’s needed most. From siting strategy to connection reform and workforce shortages, they dive into the infrastructure puzzle that underpins net zero.Key topics include:
- Why hard-to-abate sectors are struggling to secure large-scale grid connections.
- How Reload Energy is unlocking gigawatt-scale access through its power park model.
- The logic behind co-locating energy and freight infrastructure.
- How grid delays, planning, and skills shortages are slowing delivery.