Episode Details

Back to Episodes
Let's Ask Paul | Episode 104 | Transfer for optional standby, panels in cabinets, and Wire Integrity

Let's Ask Paul | Episode 104 | Transfer for optional standby, panels in cabinets, and Wire Integrity

Published 3 years, 4 months ago
Description
Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc. the leading electrical educator in the country, as he answers more questions from the Let’s Ask Paul Portal over at www.PaulAbernathy.com.

In this episode, Paul will tackle a request from a listener who asks about transfer time requirements for standby systems, a panel in a cabinet in a kitchen, and lastly, an inspector who argues wiring integrity testing for an electrical inspection.

If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit www.electricalcodeacademy.net for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.

Become a supporter of this podcast: https://www.spreaker.com/podcast/electrify-electrician-podcast--4131858/support.
Listen Now

Love PodBriefly?

If you like Podbriefly.com, please consider donating to support the ongoing development.

Support Us